University of Notre Dame construction planning and design
 
missioncampus planplanningdesignconstructioncontact
University Architect
 


Project Detail

Innovation Park


Click Image to Enlarge



Click Image to Enlarge

Project Location:

The Park is located on 12 acres of land at the south end of the Notre Dame campus.


Project Description:

Innovation Park has space available for clients with needs across a range of business development stages, from incubation to acceleration. The Park will also have space and resources for established companies with intrapraneurial venturing needs. This first building, to be completed by fall 2009, will be a three-story, 54,000 square foot structure that will include collaborative areas, conference rooms, administrative offices, incubation facilities, and lab space.  The building will be seeking LEED Certification – Silver.

Tenants will enjoy:

  • Build-to-suit office suites
  • Custom laboratories for technology platform development and pilot plant
  • Direct access to dark fiber broadband connectivity via the Metronet
  • Availability of a number of Notre Dame campus services, including the Office of Technology Transfer and the University’s world-class libraries

 Project Status:

Work on the project is wrapping up this month (September). The final touches are being completed, and furniture and equipment are being moved into the building.  By the first week of October, the landscaping will be installed and the occupants will be moved into the building.  The formal building dedication is scheduled for the 3rd week of October.

 

 



 

News from University Architect
Geddes Hall and Ryan Hall Open

The recent opening of Geddes Hall containing approx. 65,000 square feet houses both the Institute for Church Life and the Center for Social Concerns.  The building is designed to reflect an “arts and crafts” style architecture which is reflected throughout several areas of the building.  The new facility includes common shared spaces for both staff and students within the Our Lady of Mercy Chapel, coffee house, and the Fr. Don McNeill Library.  Other areas of Geddes include office space for staff and faculty, conference and meeting rooms, a large classroom/auditorium, several support spaces, and shelled space for future growth.  The project is in the process of seeking LEED certification.

Ryan Hall was successfully completed on time for fall semester occupancy with a total construction delivery of 16 months.  The spacious student rooms, social & study space, entrance vestibule, 24- hour lounge, and magnificent chapel were well received by students and parents as the first generation of students filled this new Women’s Residence Hall.  The building amenities consist of floor kitchens, an exercise room, laundry and vending.   The building has received positive feedback on the design, and traditional finishes used on the structure.  The University welcomes our newest residence hall opening.

To view further details and pictures, please click Geddes Hall or Ryan Hall.

university of notre dame

MISSION | CAMPUS PLAN | PLANNING | DESIGN | CONSTRUCTION | CONTACT

©2001 Copyright - University Architect - Business Operations
Last Modified:
February 26, 2003